The US Environmental Protection Agency has scheduled an open house and public hearing on the proposed
in situ copper recovery operation proposed in Florence. The open house will be held 4-6 pm, January 22, 2015, in Florence High School at 100 S. Main in Florence.
The EPA public hearing will take place in the same location from 7-10 pm.
Florence Copper would pump a mild acidic solution through wells drilled into the underground copper deposit and recover the dissolved copper at the surface. [
Right, schematic geologic cross section showing in situ recovery process. Credit, Florence Copper] Opponents are worried about the potential for groundwater pollution and possible impacts on proposed housing developments in the area.
No comments:
Post a Comment