
Legislation in the Arizona Senate would make changes to post-closure procedures for facilities with aquifer protection permits. Among other provisions,
SB1274 would change the existing statute from actions that "Verify that the closure design
has eliminated discharge to the extent intended," to "Verify that the
approved closure design
is routinely inspected and maintained."
No comments:
Post a Comment